> so tell me what benefits that has over having no dmarc record at all ?
The the existence of a DMARC assertion record in the DNS changes how the MTA (the receiving system) assesses the authentication of the message and authorization of the sender with SPF and/or DKIM, as per rfc7489 (and now also rfc9989).
No DMARC results in the MTA falling back to the original assessment method as defined in the original SPF and DKIM RFCs. These RFCs have design flaws and don't define the assessment flow all that well, they leave a lot up to the MTA's digression/interpretation.
So, the existence of a DMARC record with p=none is fundamentally different over not publishing a DMARC assertion record at all. It's just that with p=none you don't enforce the MTA to reject the email if it fails authentication/authorization, you're leaving it up to the MTAs digression.
> Don't confuse DMARC with DKIM or SPF; DMARC doesn't actually do anything for email security.
DMARC doesn't introduce a new security mechanism by itself, but it fixed a few bad security flaws in SPF and DKIM. Without DMARC, SPF and DKIM do not add meaningful security.
DMARC updated and formalized how receivers should handle authorization and authentication of inbound email by adding the alignment requirement. Alignment ties the SPF and/or DKIM domain to the rfc5322.From domain. This also allows receivers to use domain reputation rather than IP-reputation.
SPF by itself has a bad design flaw that completely breaks any security that SPF was supposed to provide. By adding DMARC this security hole is fixed. (Although SPF is still horribly unreliable, it should be considered legacy at this point, don't rely on SPF).
DKIM benefits from DMARC alignment requirement too. DMARC ties the rfc5322.From domain to the DKIM signing domain, which makes DKIM practical for sender authorization, not just authentication.
And because it's not trivial for SaaS to support your self-hosted IDP.
We have standards like OIDC 2.0, but every IDP (including the big ones like Entra and Google) have subtle differences that still requires custom code per IDP. So all SaaS you interact with will have to do work to support your specific IDP solution.
Then there is support, you can't reasonably expect a SaaS that you pay a few bucks a month for to help you troubleshoot problems when authenticating using your self-hosted IDP solution inevitably fails.
I found most people fixate on the price of the cells/panels, but forget that the rest of the installation required to use said panels easily exceeds the price of the panels by a factor of 3~4. Think mounting hardware, cabling, inverters, batteries, control hardware, labour, etc. It all adds up.
I've been pricing a PV system recently, and I was surprised at how low the price of panels already is. In most estimates I received the panels itself were less than 20% of the total installation costs.
Granted, I am looking at a 3-phase system with plenty of battery capacity. For a more typical household setup with 1-phase and moderate battery capacity that percentage will shift a bit.
In my case the quotes are roughly: 40x430Wp panels (~€4000), 3x (3-phase) inverter/chargers (~€5000), batteries (~€5000), auxiliaries (~€1500), cabling (~€2000), mounting hardware (~€2500), labor (~€5000), planning/permissions (~€1000). So total project price is ~25k, of which the panels are only ~€4000.
And that doesn't even count the construction of a utility building to house the batteries and inverters, the EV chargers, etc.
On a side note: I found that battery prices have also dropped significantly already. If you're willing to do some assembly yourself you can get ~15kWh of LiFePO4 for just over €1k.
Also, for those wondering: for my situation the ROI of this setup is expected to be about 5 years. This will be quicker if I get an EV, which I am planning on.
Micro plug-in panels address the pricing issues. If every panel has a built-in inverter/controller then everything can be wired at the factory, radically reducing costs. As they are all pushing AC then they can all be plugged in to household outlets without electricians getting involved. Mounting remains an issue but as purchase costs come down the need for a perfect mounting system diminishes.
> How are you spending 5000+ EUR per year on electricity?
Energy prices are high in my country, and price spikes have become more frequent.
My house is currently heated by natural gas, which costs about €200/month avg plus another €550/year in standing charges. Prices for natural gas is expected to rise. By switching to heat pumps and induction cooktop I can disconnect from the gas distribution grid completely. This will safe about €3k in gas costs annually (against current rates) but obviously increase my electricity usage significantly. So in my country €5k/year in electricity isn't as ridiculous as it sounds.
I'm projecting my electricity consumption to be ~€3.5k a year once I have fully switched to electric heating, so this is where generating my own electricity starts to make sense.
The PV array I'm planning is very much over dimensioned for my use. To make financial sense my PV installation must produce more than I consume over the year. Not only will my electricity bill be effectively €0, I will also be able sell overproduction back to the grid during summer. By using variable rate discharging I can optimize the return. I am projecting that selling overproduction will net about €1k annually.
The rest comes from from dynamic energy tariff trading. The battery will be used as a grid stabiliser, so it'll charge (from the grid) when electricity is cheap/negative and discharge back to the grid when return rate is high. This is projected to net another €500~€1000 annually.
If I add an EV I'll safe about 3k/year in fuel, though my electricity use will obviously go up, I won't have as much overproduction anymore.
In my country PV only really makes sense when it's combined with batteries and connected to the grid with a variable rate contract. The more battery capacity you have the more value/income it can create stabilising the grid. So really the price per kWh of battery capacity is the driving force in the ROI of a PV setup.
I'm on the same boat with a 4080, the extra GPU RAM of the 4090 over the 4080 would have been nice, but it still wouldn't be able to run any decent models.
I configured my PC in December 2023 with a kit of 2x32GB DDR5-6000 for €249, thinking I would upgrade that RAM later to 128GB by just adding another kit. Now nearly 3 years later that same kit is over €1500 :-(
I've also lost all interest in upgrading to a 50-series GPU. With exception of the ludicrously expensive 5090 the entire 50-series lineup is capped at 16GB, I don't see the benefit of upgrading.
Yea - (I wish I had gone with 64Gb ram...) there is no reasonable upgrade path for us beyond waiting, unless the 5090 comes down to MSRP, which is unlikely. The 4080 is still a nice GPU, but the 4090 would have been a better option, if we'd known what was coming!
40% overhead is quite typical, so you'd be looking at $120k/year. In the USA I'd consider that a competitive salary for an admin capable or keeping a $6M rack of specialized hardware running 24/7.
Yeah but you don't need two such people, or even one, dedicated to this single rack.
A company of the size that this is worthwhile for, probably has dedicated devops on staff already and can add this rack to the inventory with no additional staff.
The companies which have the will and the budget to host their own LLMs typically require a ton of other, much smaller, models as well.
They have internal security requirements, guardrails, audit, critical workflows start depending on your onprem setup, downtime is now something that’s not even allowed.
There’s going to be a zoo of tooling, lots of bespoke work with internal clients who have no clue about docker, but now want their vibe-coded app to access a model they downloaded yesterday, and this model better be served and monitored 24/7 because now C-levels use it.
No one is going to budget several millions to then look at an email admin who hears ‘cuda’ for the first time in their life and ask them to just support the entire thing somehow.
And god forbid it’s an AMD setup.
This obviously isn’t relevant for a 10-person startup and their second-hand xeon with a single H100.
From my experience only the companies which are REALLY interested in privacy and data security bother with hosting their own models
My company is not even the same ballpark, but even we already have people for it. And doesn't include the fact that you can get a colo location and just a MSP or a contractor to do it for you
Not really. Spain's traditional format is dd/mm/yyyy with slashes. This applies for a good chunk of Europe. Germany/Austria uses dot, I think nordic countries embraced the dash. While you might see more adoption in offical/digital contexts, I just double checked a few popular spanish websites, all slashes.
A sizeable chunk of that $9 goes to the content creators actually.
Also, the content creators get paid more per view if the view is coming from a paid viewer.
reply