I run a power grid. We have our own fiber optic network, run on the towers. 100% air gapped. No working from home. No IOT. Nothing fancy. SCADA control center staffed 24/7. If I want to know something I call them. This is the only way.
I've been buying peptides for over 10 years and know all about them becoming popular in the news. I live in Asia. Living in Europe isn't an excuse. You're indeed under a rock. I've never been to silicon valley.
I've done it. The larger the grid, the more difficult it is. But as long as you have fuel and an adequately maintained grid, its not as hard as some in the comments make it out to be. Better regulation would make it easier. For instance, in Singapore emergency diesel or some other method for black start is a requirement for most generation stations. The rest of the world likely has more lax requirements.
I’ve done small systems less than 2 MW with 2-3 generators, a mix of hydro and diesel, and only distribution level voltages.
It seems like you would black start some plant using its backup diesel generator to power pumps and controls, probably synchronize at least two units at the plant, then pick up some part of the transmission system. Perhaps the capacitance of the grid is and issue when it is unloaded, so the trick is to make sure enough real and reactive capacity is online for each subsequent transmission or load step. Probably a lot of transmission steps come with a significant amount of load too - not just picking up unloaded transmission lines. Sounds really fun, banging all the governors and exciters with once in a decade load steps
No it's not. It's a pain in the ass but this isn't even close to correct. There are rocket launches and nanometer scale chips being built by engineers. Firing up some emergency diesel generators and syncing loads isn't easy, but don't be silly. I'm in charge of black start for a power grid. I've done it once and not looking forward to doing it again, but I'm not stressed out about it. And I'm not super smart.